• 866-376-2463
  • Contact
  • Search
Efficiency Maine Logo Search
Menu
  • At Home
    • Solutions
      • Appliances
      • Electric Vehicles
      • Heating and Cooling
      • Insulation
      • Lighting
      • Renewables
      • Water Heating
    • Incentives
      • Biomass Boilers and Furnaces
      • Circulator Pumps
      • Clothes Washers
      • DIY Winter Prep Rebate
      • Electric Vehicles
      • Geothermal Systems
      • Heat Pumps
      • Heat Pump Water Heaters
      • Insulation
      • Income-Eligible Options
      • Natural Gas
      • Room Air Purifiers
    • Getting Started
      • EV Rebate Participating Dealers
      • Find a Vendor
      • Home Energy Loans
      • Income-Based Eligibility Verification
      • Residential Forms and Brochures
      • Vendor Support
    • Tools and Tips
      • Best Heat Pump Water Heater Deals
      • Calculate Your Home’s Energy Efficiency
      • Compare Home Heating Costs
      • Compare Water Heating Costs
      • Electric Vehicle Resources
      • Electricity Monitor Loaners
      • Electricity Rate Options
      • Energy Saving Tips
      • EV Charging Station Locator
      • Lighting Savings Calculator
      • Residential Virtual Tour
      • Vehicle Cost Calculator
  • At Work
    • Solutions
      • Agricultural
      • Commercial Kitchen
      • Compressed Air
      • Electric Vehicles
      • Heating, Ventilation, and Air Conditioning (HVAC)
      • Lighting
      • Multifamily Weatherization
      • Refrigeration
      • Water Heating
    • Incentives
      • Agricultural
      • Circulator Pumps
      • Commercial Kitchen
      • Compressed Air
      • Electric Vehicles
      • Heating, Ventilation, and Air Conditioning (HVAC)
      • Heat Pump Water Heaters
      • Lighting
      • Multifamily Weatherization
      • Refrigeration
    • Getting Started
      • Commercial and Industrial Prescriptive Incentives
      • Commercial and Industrial Custom
      • Commercial Property Assessed Clean Energy (C-PACE)
      • Find a Qualified Partner
      • Natural Gas Customers
      • Small Business Energy Loans
      • Virtual Customer Consultations
    • Sectors
      • Education
      • Grocery and Convenience
      • Healthcare
      • Hospitality
      • Manufacturing
      • Multifamily
      • Municipal
      • Office
      • Restaurant
      • Small Business
      • Warehouse
  • Resources
    • Blog
    • Building Energy Codes
    • Case Studies
    • Events
    • Professional Training
    • Residential Forms and Brochures
    • Resources for Homeowners
    • Resources for Municipalities
    • Resources for Realtors
    • Resources for Renters
  • About
    • News
    • Board
    • Library
    • Opportunities
    • Federal Funding
    • Staff
    • Careers
    • Contact
    • Subscribe

RFP EM-011-2023

RFP EM-011-2023: DC Fast Charging Stations – Maine Phase 5

The Efficiency Maine Trust (the Trust) seeks qualified bidders to install and operate DC Fast Chargers (DCFC) for electric vehicles (EVs) along select “Alternative Fuel Corridors” in Maine. This solicitation is part of the National Electric Vehicle Infrastructure (NEVI) Formula Program and will use funds dedicated to EV charging infrastructure through the Bipartisan Infrastructure Law (BIL). The NEVI program aims to strategically deploy EV charging infrastructure along the nation’s Alternative Fuel Corridors. The target areas particular to this RFP are located on US Route 1 and Interstate 95 consistent with the Maine Plan for EV Infrastructure Deployment published by the Maine Department of Transportation (MaineDOT) in July 2022. The Trust will accept bids that propose to serve only one location as well as bids proposing to serve multiple locations.

Documents

  • Request for Proposals (PDF)
  • Attachment A – Project Cost Proposal Form (.xlsx)
  • Attachment B – Standard Agreement (.docx)
  • Attachment C – Eligible Segment Maps (PDF)
  • Attachment D – Data Capture and Reporting Requirements (PDF)
  • Attachment E – CMP Load Form (.xlsx)
  • Attachment F – Versant Load Form (.xlsx)

Additional Materials

  • List of Interested Host Sites (PDF)
  • Host Site Interest Form
  • List of EV Charging Service Providers (PDF)
  • Maine Plan for Electric Vehicle Infrastructure Deployment (PEVID) (PDF)

Informational Webinars

  • Bidder’s Informational Webinar #1: Monday, April 5, 2023 at 1:00pm – CLICK HERE TO REGISTER
  • Bidder’s Informational Webinar #2: Wednesday, May 10, 2023 at 10:00am – CLICK HERE TO REGISTER

Submission Form

"*" indicates required fields

An individual authorized to commit the prime contractor must complete and sign this form. You may save and return to the form as needed.

Address*















Max. file size: 32 MB.

Project Cost Form:
Max. file size: 32 MB.

Do you accept all of the terms and conditions in the Standard Agreement (Attachment B)?*


Standard Agreement redlines or exceptions:
Max. file size: 32 MB.











Learn More

  • At Home
  • At Work
  • Resources

Efficiency Maine

  • About
  • Contact
  • Sitemap
  • Privacy Policy

Contact

866-376-2463

INFO@EFFICIENCYMAINE.COM

Follow Efficiency Maine Via Email

Click to follow and receive notifications of new offers by email.

Follow

© COPYRIGHT 2023 EFFICIENCY MAINE