• 866-376-2463
  • Contact
  • Search
Efficiency Maine Logo Search
Menu
  • At Home
    • Solutions
      • Appliances
      • Batteries
      • Electric Vehicles
      • Heating and Cooling
      • Insulation
      • Lighting
      • Renewables
      • Water Heating
    • Rebates
      • Batteries
      • Biomass Boilers and Furnaces
      • Circulator Pumps
      • Clothes Washers
      • Electric Vehicles
      • Geothermal Heat Pump Rebates
      • Heat Pumps
      • Heat Pump Water Heaters
      • Insulation
      • Income-Eligible Options
      • Natural Gas
    • Getting Started
      • Find a Vendor
      • Home Energy Loans
      • Income-Based Eligibility Verification
      • Residential Forms and Brochures
      • Vendor Support
    • Tools and Tips
      • Best Heat Pump Water Heater Deals
      • Compare Your Home’s Overall Energy Efficiency
      • Compare Home Heating Costs
      • Compare Water Heating Costs
      • Electricity Monitor Loaners
      • Energy Saving Tips
      • Heat Load Estimator
      • Lighting Savings Calculator
  • At Work
    • Solutions
      • Agricultural
      • Batteries
      • Compressed Air
      • Electric Vehicles
      • Heating, Ventilation, and Air Conditioning (HVAC)
      • Lighting
      • Multifamily Weatherization
      • Refrigeration
      • Water Heating
    • Incentives
      • Agricultural
      • Batteries
      • Biomass Heating Systems
      • Circulator Pumps
      • Compressed Air
      • Demand Response
      • Electric Vehicles
      • Heating, Ventilation, and Air Conditioning (HVAC)
      • Lighting
      • Multifamily Weatherization
      • Refrigeration
      • Water Heating
    • Getting Started
      • Become A Qualified Partner
      • Commercial Heating Calculator
      • Commercial and Industrial Prescriptive Incentives
      • Commercial and Industrial Custom
      • Commercial Property Assessed Clean Energy (C-PACE)
      • Find a Qualified Partner
      • Municipal Lease
      • Small Business Energy Loans
      • Virtual Customer Consultations
    • Sectors
      • Education
      • Grocery and Convenience
      • Healthcare
      • Hospitality
      • Manufacturing
      • Multifamily
      • Municipal
      • Office
      • Restaurant
      • Small Business
      • Warehouse
  • Green Bank
    • Commercial Property Assessed Clean Energy (C-PACE)
    • Home Energy Loans
    • Long-Term Care Facility Loans
    • Mobile Home Initiative Loans
    • Municipal Lease
    • Small Business Energy Loans
  • Resources
    • Blog
    • Building Energy Codes
    • Case Studies
    • Events
    • Federal Funding
    • Innovation Program
    • Presentations
    • Residential Forms and Brochures
    • Resources for Homeowners
    • Resources for Municipalities
    • Resources for Renters
  • About
    • News
    • Board
    • Library
    • Opportunities
    • Staff
    • Careers
    • Contact
    • Subscribe

RFP EM-004-2026

Public DC Fast Chargers: Phase 10

Efficiency Maine (Efficiency Maine Trust or the Trust) sought qualified bidders to install and operate public DC fast chargers (DCFC) for electric vehicles (EVs) within one (1) driving mile of select roadway exits or routes.

Map of Maine depicting eligible towns for RFP EM-004-2026

Documents

  • Request for Proposal (PDF)
  • Attachment A – Project Cost Proposal Form (.xlsx)
  • Attachment B – Standard Agreement CORRECTED on 10/3/2025 (.docx)
  • Attachment C – Eligible Segment Maps (PDF)
  • Attachment D – CMP Load Form (.xlsx)
  • Attachment E – Versant Bangor Hydro District Load Form (.xlsx)
  • Attachment F – W-9 Form (PDF)
  • FHWA 1273 (PDF)
  • Responses to Questions (PDF)

Utility Information

To get an estimate for new three-phase power in CMP territory:

  1. Call New Service Team (1-866-225-4200). 
  2. Create an account unless you will be connecting to an existing meter.
  3. Create a notification for cost opinion with a location.

For questions about utility capacity and rate structures in CMP territory, contact Aaron Smith (Aaron.Smith@cmpco.com; 207-844-9202).

To get an estimate for new three-phase power in Versant territory:

  1. Call Customer Contact Center (207-973-2000) with the physical address of the location where work is to be completed.
  2. Submit Load Sheet (Bangor Hydro District) via email to loadsheet@versantpower.com.

Locations with a battery must follow Versant’s Distribution & Interconnection Process.

Additional Materials

  • Maine Accessible EV Charging Guide and Checklists: Guide to locating and installing accessible and usable AC Level 2 and Level 3 electric vehicle chargers for public use.
  • Host Site Interest Form (Phase 10)

Learn More

  • At Home
  • At Work
  • Resources

Efficiency Maine

  • Sitemap
  • Privacy Policy
  • Careers
  • About

Connect

  • 866-376-2463
  • INFO@EFFICIENCYMAINE.COM
  • MAILING ADDRESS

SUBSCRIBE TO EFFICIENCY MAINE EMAILS

Click to choose which notifications to receive via email.

Subscribe

©2026 EFFICIENCY MAINE