• 866-376-2463
  • Contact
  • Search
Efficiency Maine Logo Search
Menu
  • At Home
    • Solutions
      • Appliances
      • Electric Vehicles
      • Heating and Cooling
      • Insulation
      • Lighting
      • Renewables
      • Water Heating
    • Incentives
      • Biomass Boilers and Furnaces
      • Circulator Pumps
      • Clothes Washers
      • Electric Vehicles
      • Geothermal Systems
      • Heat Pumps
      • Heat Pump Water Heaters
      • Insulation
      • Income-Eligible Options
      • Load Management
      • Natural Gas
    • Getting Started
      • EV Rebate Participating Dealers
      • Find a Vendor
      • Home Energy Loans
      • Income-Based Eligibility Verification
      • Residential Forms and Brochures
      • Vendor Support
    • Tools and Tips
      • Best Heat Pump Water Heater Deals
      • Calculate Your Home’s Energy Efficiency
      • Compare Home Heating Costs
      • Compare Water Heating Costs
      • Electric Vehicle Resources
      • Electricity Monitor Loaners
      • Electricity Rate Options
      • Energy Saving Tips
      • Heat Load Estimator
      • EV Charging Station Locator
      • Lighting Savings Calculator
      • Vehicle Cost Calculator
  • At Work
    • Solutions
      • Agricultural
      • Compressed Air
      • Electric Vehicles
      • Heating, Ventilation, and Air Conditioning (HVAC)
      • Lighting
      • Multifamily Weatherization
      • Refrigeration
      • Water Heating
    • Incentives
      • Agricultural
      • Biomass Heating Systems
      • Circulator Pumps
      • Compressed Air
      • Electric Vehicles
      • Heating, Ventilation, and Air Conditioning (HVAC)
      • Lighting
      • Multifamily Weatherization
      • Refrigeration
      • Water Heating
    • Getting Started
      • Become A Qualified Partner
      • Commercial Heating Calculator
      • Commercial and Industrial Prescriptive Incentives
      • Commercial and Industrial Custom
      • Commercial Property Assessed Clean Energy (C-PACE)
      • Find a Qualified Partner
      • Municipal Lease
      • Natural Gas Customers
      • Small Business Energy Loans
      • Virtual Customer Consultations
    • Sectors
      • Education
      • Grocery and Convenience
      • Healthcare
      • Hospitality
      • Manufacturing
      • Multifamily
      • Municipal
      • Office
      • Restaurant
      • Small Business
      • Warehouse
  • Green Bank
    • Commercial Property Assessed Clean Energy (C-PACE)
    • Home Energy Loans
    • Manufactured Home Heat Pump Lease
    • Municipal Lease
    • Small Business Energy Loans
  • Resources
    • Blog
    • Building Energy Codes
    • Case Studies
    • Events
    • Federal Funding
    • Innovation Program
    • Presentations
    • Professional Training
    • Residential Forms and Brochures
    • Resources for Homeowners
    • Resources for Municipalities
    • Resources for Realtors
    • Resources for Renters
  • About
    • News
    • Board
    • Library
    • Opportunities
    • Staff
    • Careers
    • Contact
    • Subscribe

RFP EM-010-2024

RFP EM-010-2024: DC Fast Charging Stations – Maine Phase 6

The Efficiency Maine Trust (the Trust) seeks qualified bidders to install and operate DC Fast Chargers (DCFC) for electric vehicles (EVs) along select “Alternative Fuel Corridors” in Maine. This solicitation will use funds dedicated to EV charging infrastructure from the National Electric Vehicle Infrastructure (NEVI) Formula Program through the Bipartisan Infrastructure Law (BIL). The NEVI program aims to strategically deploy EV charging infrastructure along the nation’s Alternative Fuel Corridors.

The target areas particular to this RFP are located along certain segments of Interstate 295 and US Route 1A in Portland, Interstate 95 from Clinton to Newport, Interstate 95 in Hampden, Interstate 95 in Bangor, US Route 2 from Rumford to Dixfield, US Route 302 in North Windham, and US Route 302 from Fryeburg to Bridgton consistent with Maine’s Updated Plan for EV Infrastructure Deployment (Maine’s NEVI Plan) published by the Maine Department of Transportation (MaineDOT) in July 2023. Bids that propose to serve only one location will be eligible, and bids proposing to serve multiple locations will also be acceptable.

Documents

  • Request for Proposals UPDATED on 11/22/2023 (PDF)
  • Attachment A – Project Cost Proposal Form (.xlsx)
  • Attachment B – Sample Contract for EV Charging Stations Using NEVI Funds (Phase 6) (.docx)
  • Attachment C – Maps of Eligible Route Segments UPDATED on 11/6/2023 (PDF)
  • Attachment D – Data Capture and Reporting Requirements (PDF)
  • Attachment E – Utility Load Form – Central Maine Power (.xlsx)
  • Attachment F – Utility Load Form – Versant Power (.xlsx)
  • Attachment G — Confidentiality, Non-Disclosure and Protective Agreement (PDF)
  • Attachment H — Team Commitment Form (.docx)
  • Responses to Questions UPDATED on 11/28/023

Additional Materials

  • Host Site Interest Form (Phase 6)

  • List of EV Charging Service Providers (PDF)

Informational Webinars

  • Bidders’ Informational Webinar #1: Wednesday, November 1, 2023 at 9:00a.m. – Click here for presentation slides
  • Bidders’ Informational Webinar #2: Tuesday, December 12, 2023 at 1:00p.m. – CLICK HERE TO REGISTER

Submission Form

"*" indicates required fields

An individual authorized to commit the prime contractor must complete and sign this form. You may save and return to the form as needed.

Address*















Max. file size: 32 MB.

Project Cost Form:
Max. file size: 32 MB.

Project Cost Form:
Max. file size: 32 MB.

Project Cost Form:
Max. file size: 32 MB.

Project Cost Form:
Max. file size: 32 MB.

Project Cost Form:
Max. file size: 32 MB.

Max. file size: 32 MB.











Learn More

  • At Home
  • At Work
  • Resources

Efficiency Maine

  • About
  • Contact
  • Sitemap
  • Privacy Policy

Contact

866-376-2463

INFO@EFFICIENCYMAINE.COM

Follow Efficiency Maine Via Email

Click to follow and receive notifications of new offers by email.

Follow

© COPYRIGHT 2023 EFFICIENCY MAINE