BIW Ventilation Case Study
In 2018, BIW launched an effort to upgrade the building with the goals of improving air quality, increasing winter space temperature, reducing the negative pressure, and saving energy.
In 2018, BIW launched an effort to upgrade the building with the goals of improving air quality, increasing winter space temperature, reducing the negative pressure, and saving energy.